Most important projects

Installation of technological equipment at a cellulose-processing plant


Detail

Installation of boilers and accessories during the construction of a new woodworking factory


Detail

Delivery and installation of pipelines, OK, equipment installation during the new woodworking factory construction


Detail

Installation of HVAC pipelines and drying cabinets in the candy factory


Detail

Installation of pipelines and equipment for the project entitled: „Inštalácia tandemových turbosústrojenstiev KS03“ (Installation of tandem compressors KS03)


Detail

Installation of cooling equipment


Detail

Relocation and installation of gum candy production line


Detail

Modernization of an alternative fuel plant


Detail

Assembly of pre-isolated lines in harbor (diesel, gasoline)


Detail

Relocation of handkerchief automat


Detail

DA 503 column – platform repair and preparation of welding joints for UT


Detail

Installation of pipelines in the Unipetrol refinery during the shutdown maintenance in 2011


Detail

Disassembly and installation of heat exchanger


Detail

Expansion of storage capacity for diesel fuel, Gajary (Extraction stage I.-II.) PS 027.3, Assembly of pipelines


Detail

Paper mill – Finland


Detail