Deutsch version Slovenská verzia English version

Most important projects

Jaguar Land Rover Nitra – Cooling

Klimak, Nitra, SK, 2017


Detail
  •  

Drier with filtration, Falco Zrt.

Szombathely, Hungary, 2017


Detail
  •  

Disassembly and assembly (heating, press and forming line)

Auxerre, France, 2017


Detail
  •  

Shutdown Clausy

Euromont Group, Czech republic, 2016


Detail
  •  

Assembly of conveyors

Jiffy, Netherlands, 2016.


Detail
  •  

Technology relocation, BASF Poland

Poland - Slovakia, 2016.


Detail
  •  

Welding, Litvinov, CZ

Unipetrol, 2016.


Detail
  •  

Disassembly and assembly during GR at TZ EJ II in Slovnaft

Slovnaft, Bratislava, 2016.


Detail
  •  

HVAC and line relocation


Detail
  •  

Assembly of pipelines and installation of equipment in SSM


Detail
  •  

Construction of a fuel storage tank, Rarotonga, Cook Islands (detail)


Detail
  •  

Renovation of poultry processing systems

Extensive project carried out within entire EU (2015)


Detail
  •  

Disassembly and assembly during GR at VJ RHC


Detail
  •  

Assembly and reconstruction works on devices and columns at VJ AVD6


Detail
  •  

Slovnaft RHC


Detail
  •  

Installation of cooling water pipeline at Synthos plant


Detail
  •  

Installation of technological equipment at a cellulose-processing plant


Detail
  •  

Installation of boilers and accessories during the construction of a new woodworking factory


Detail
  •  

Delivery and installation of pipelines, OK, equipment installation during the new woodworking factory construction


Detail
  •  

Installation of HVAC pipelines and drying cabinets in the candy factory


Detail
  •  

Installation of pipelines and equipment for the project entitled: „Inštalácia tandemových turbosústrojenstiev KS03“ (Installation of tandem compressors KS03)


Detail
  •  

Installation of cooling equipment


Detail
  •  

Relocation and installation of gum candy production line


Detail
  •  

Modernization of an alternative fuel plant


Detail
  •  

Assembly of pre-isolated lines in harbor (diesel, gasoline)


Detail
  •  

Relocation of handkerchief automat


Detail
  •  

DA 503 column – platform repair and preparation of welding joints for UT


Detail
  •  

Installation of pipelines in the Unipetrol refinery during the shutdown maintenance in 2011


Detail
  •  

Disassembly and installation of heat exchanger


Detail
  •  

Expansion of storage capacity for diesel fuel, Gajary (Extraction stage I.-II.) PS 027.3, Assembly of pipelines


Detail
  •  

Paper mill – Finland


Detail
  •